Design of transport and pedestrian schemes and traffic management systems


 

An important part of "KyivDorMistProekt" Institute (KDMP) activity is designing transport and pedestrian schemes and traffic management systems.
These tasks are performed by the KDMP experts as a single package aimed at creating traffic management system (TMS) adequate to the current situation and the challenges of tomorrow.
 

The Institute has won a tender to develop an integrated automated system of traffic management in Kyiv. The first stage of the system, designed by our experts, has already been completed. Currently we study design documents of the second stage of the above control system development, which involves connection of 150 additional sets of traffic lights to the central point of traffic control.

  Other individual projects developed by our group also aim at promoting the improvement of traffic management in the capital, namely: organizing one-way traffic on some streets in Podolskyi district of Kyiv (development of construction documents, PE Shcherbyna V. V.); expansion of the roadway due to open yield points at bus stops of overland passenger transport (DD stage, PE Pinchuk V. M.); organization of urban passenger traffic by rail in Kyiv city ("Project" stage, PE Khalilov R. I.).
 

We take care of pedestrians too. Thus, the project of Peremohy Avenue reconstruction being under development involves integrated reconstruction of underground pedestrian crossings ("Working draft" stage, PE Shchur I. A.).
Our experts designed a series of elevated pedestrian crossings, for example:
- Elevated pedestrian crossing at the intersection of Chervonozoriany Avenue near Kirovohradska Str. (metal foot-bridge with tubing lifts, bridge length - 47 m, decking length - 42 m. Project Engineer - Pinchuk V. M., architect as project manager - Chernii K. S.);
- Elevated pedestrian crossing in Akademika Zabolotnoho Str. (metal foot-bridge with tubing lifts, bridge length - 59 m, decking length – 51.8 m. Project Engineer - Nezhyvoi O. H., architect as project manager - Samoilova O. V.);
- Elevated pedestrian crossing over Stolychne highway (metal arch-cable foot-bridge with tubing lifts, bridge length - 50 m, coverage – 300 sq. m. Project Engineer - Pinchuk V. M., architect as project manager - Petrovskyi O.)
 

 

- Foot-bridge over Chervonozoriany Avenue near Moskovska Square (length - 37 m, balk – 27.5 m, coverage - 230 sq. m. Project Engineer - Khalilov R. I.);
- New pedestrian crossing across Nauky Avenue near Moskovska Square (coverage -1,313 sq. m, building area, Project Engineer - Khalilov R. I.).